The transformation of De Oliphant into The Sharing Tower is almost complete. To meet the wishes and requirements of ‘millennials, tomorrow’s entrepreneurs and employees’, the iconic office building on Haaksbergweg in Amsterdam is being completely revitalised and reconfigured. The focus is not only on maximum openness, mobility, flexibility, transparency and freedom, but also on excellent shareability. The aim is for The Sharing Tower to become the first multi-tenant office building in the Netherlands to focus entirely on the sharing economy.

The former ING office is located in the heart of Amsterdam Zuidoost, close to Bijlmer-ArenA station and the Johan Cruijff ArenA. The building dates from 1992 and until recently had a floor area of 14,000 m². This was increased to 22,000 m² during the redevelopment. Alongside office facilities, the building will house a range of public amenities, including a restaurant, wine bar and gym. The aim is to create a future-proof building that will remain fit for purpose for another 20 years. Sustainable use of materials, smart lighting, low-temperature heating and climate ceilings are expected to help secure BREEAM-NL ‘Very Good’ certification.

In de nieuwe woonwijk Hooghkamer wordt de laatste hand gelegd aan de realisatie van 36 ruime eengezinswoningen, die na oplevering all-electric zullen functioneren.

Air duct system in the basement.

Complete system

As a regular partner of mechanical services contractor Roodenburg Installatie Bedrijf, operating companies Schilt Luchtkanalen and Schilt Luchttechniek engineered, supplied and installed a completely new and sustainable air duct system for The Sharing Tower. The system was installed in accordance with Luka-C certification criteria and includes all TROX components, such as fire dampers, damper sections, volume control dampers, reheaters, silencers and grilles. “In total, we installed around 6,000 m² of rectangular ductwork and around 3,500 linear metres of circular ductwork, with flexible connections to the climate ceilings,” says Ben Stierman, project manager at Schilt Luchtkanalen. “Most of the ductwork is made of galvanised steel. Aluminium was chosen for the kitchen area. On the roof, we installed around 1,200 m² of self-supporting, fully insulated rectangular ductwork. The external ducts are finished with a glass-fibre-reinforced polyester casing in RAL 7004.”

Tenant requirements

The shell work has now been completed, says Stierman. “We are currently working on the requirements of the first tenants. And that is no easy task. Partitions are still being added in various parts of the building, extra meeting rooms are being fitted out and, for example, printers are being installed, all of which has implications for the ventilation system. To ensure a healthy indoor climate in The Sharing Tower, grilles have to be moved in various locations, extract ventilation added and/or air change rates increased. Branches in the air ducts have to be modified, which means reopening the chilled ceilings. It is a major job, and we will be continuing with it over the coming months.”

A business enquiry for Schilt bedrijven? Get in touch

Who worked on it

The Sharing Tower in Amsterdam, transformation

  1. air duct systemSchilt
  2. Mechanical services contractorRoodenburg Installatie Bedrijf
  3. componentsTROX

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectThe Sharing Tower
  • ThemeHealthy indoor air
  • SubjectProjects
  • CompanySchilt bedrijven
  • CompanyRoodenburg Installatie Bedrijf
  • CompanyTROX
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.