Projects

‘Transformation gives former MST hospital a new face for the surrounding area’

‘Transformation gives former MST hospital a new face for the surrounding area’

Over the coming years, the former MST hospital on Ariënsplein in Enschede will be transformed into a vibrant place where business, work, learning, relaxation, recreation and student accommodation come together. The complex, which is owned by Antwerp-based property developer LIFE, will be refurbished in phases and will ultimately become the neighbourhood’s new beating heart. IAA Architecten is responsible for designing the transformation.

“Over the past hundred years, the former hospital has been continually extended and refurbished. Its structure and construction therefore helped determine where the new functions could be accommodated,” says Jeroen Nijmeijer, Partner Engineering at Enschede-based IAA Architecten. “We first worked with the client to develop an overall vision, setting out the functions and sketches, which the municipality also supported. Two former ward wings at the rear have now been converted into student accommodation. The open column structure of the side wings, built in the 1970s, makes them highly suitable for classrooms and teaching laboratories. We worked with Saxion, for which we have already designed several buildings in the immediate vicinity of Ariënsplein, to create a new layout for these wings. The central section of the building will provide space for workplaces, co-working and live-work studios. The parking spaces in the forecourt are to be replaced by a green meeting place.”

The light, tranquil interior appeals to a wide range of users.

Preserving and enhancing valuable features

The starting point in the design phase was to preserve and enhance valuable features of the hospital, such as the chapel, and to give the building a soul again and a clear identity for the outside world, says Nijmeijer. “We assessed the quality of all the spaces and, wherever possible, removed partition walls, suspended ceilings and building services. This included the ground and first floors in the heart of the hospital, where ceilings up to 4.5 metres high were revealed. These will remain exposed in the new design, allowing the building’s height and spaciousness to be fully appreciated and maximising the amount of daylight entering. Asbestos has been removed throughout the building, and old building services have been replaced with sustainable systems that ensure optimal working and living comfort.”

More calm and greenery

All the building façades are being refreshed, with masonry and paintwork repaired where necessary, he says. “In addition, window frames, glazing and solar shading are being replaced in various locations. The listed fence at the rear is being repaired, and parking spaces are making way for greenery, creating a calmer atmosphere and a more attractive, clearly defined appearance for the surrounding area.”

Question about this story? Ask your question

Who worked on it

MST ziekenhuis in Enschede, transformatie

  1. property developerLIFE
  2. architectIAA Architecten

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectMST ziekenhuis
  • SubjectProjects
  • CompanyLIFE
  • CompanyIAA Architecten
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.