Zuidplas municipality began using its new municipal offices in Nieuwerkerk aan den IJssel on 3 June. Sustainability, health and comfort were central to the project. “The design and construction were carried out in accordance with the BREEAM-NL ‘Excellent’ certification criteria,” says Martin van Dijk, Project Manager, Mechanical Services at Lomans Capelle.
The full-service building services contractor from Capelle aan den IJssel is responsible for all the mechanical and electrical installations. These range from heating, cooling and ventilation to electrical systems, LED lighting, intruder and fire alarm systems, and access control systems. Subsidiary Montage Jongens installed the solar thermal collectors on the roof, while a second subsidiary, De Groene Jongens, provided BREEAM consultancy.

Two heat pumps and a large number of solar thermal collectors have been installed on the roof of the new building.
A carefully designed climate control system
“Two heat pumps have been installed on the roof of the new building. They supply heating and cooling to the air handling units in the plant room and to the terminal units throughout the building,” says Van Dijk. “For local control, we have used ceiling induction units, which can provide both heating and cooling. This demand-controlled ventilation is regulated not only by temperature but also by CO2 levels. Underfloor heating and cooling have also been installed in public areas such as the atrium and customer advice area. Climate ceilings have been fitted in several spaces, including the public areas, wedding room, council chamber and two meeting rooms.”

Workspace in the new municipal offices.
Water-saving measures
Water-saving toilets with a 4-litre flush have been installed in the toilet facilities. Van Dijk says: “Each toilet block has a shut-off valve in the water system, linked to the lighting system. As soon as staff or visitors enter the toilet facilities and switch on the lights, the shut-off valve opens automatically and pressure builds up in the water supply. This prevents water from being wasted, for example if a toilet keeps running or a tap is left on.”

Inverters for the PV system.
Virtual reality tour
Lomans Capelle and main contractor Heembouw developed the design for the municipal offices in Revit and delivered it as a virtual model. “We then invited Zuidplas municipality to take a VR tour of the building,” says Van Dijk. “It was very well received. Following the tour, a few more optimisations were made, and construction began in June 2018. The new building was completed last April, to the great satisfaction of all the parties involved.”
Question about this story? Ask your question
Who worked on it
Zuidplas town hall in Zuidplas
- full-service installerLomans Capelle
- building contractorHeembouw
- installeerde de zonnecollectorenMontage Jongens
- BREEAM-begeleidingDe Groene Jongens
Keep following this
Get an email when a new story is published. No account needed.
- ProjectZuidplas town hall
- SubjectProjects
- CompanyLomans Capelle
- CompanyHeembouw
- CompanyMontage Jongens
- CompanyDe Groene Jongens