Sanitaryware

Amphia Ziekenhuis, Breda | Amphia ziekenhuis with flushing technology in a prefabricated wall module

Amphia Ziekenhuis, Breda | Amphia ziekenhuis with flushing technology in a prefabricated wall module

Amphia ziekenhuis in Breda wanted a sustainable, future-proof and modern building with a high-quality, attractive finish. High-quality installation materials are a natural fit for this vision.

Innovatech

WC cistern frame.

Mr John Holterman, prefab coordinator at Triple P, Unica’s prefab production centre: “Years ago, together with TECE, we developed a unique concept: a prefabricated wall module with an integrated flushing system. The Triple P Unicare wall module is a complete solution that integrates building and installation work. The system is available in BIM Revit and is a considered solution for logistics, demountable construction and sustainable building. For Amphia ziekenhuis, we supplied 165 concealed frames (2 x toilet and 2 x shower), 180 accessible WC frames, 190 standard WC frames and 50 washbasin frames. These were then installed by Unica Rotterdam.”

Unica Triple P designs, manufactures and supplies integrated modular prefabricated solutions for building services and logistics challenges in non-residential buildings, for both clients and installers.

The TECE WC frame uses proven technology. The mounting frame is stable and self-supporting. It can be secured in a range of ways, for example to a pre-wall using angle brackets. Several slots are provided on the sides of the frame for this purpose. Integrated holes are provided for mounting on metal or timber studs. The frame has an extra-stable crossbar with four screw holes for mounting the ceramic fixture. Adjustable feet are fitted at the bottom of the frame. They can be extended effortlessly to the required installation height. The foot brake prevents the frame from sliding back down. The feet are suitable for floor mounting and can be secured to a TECEprofil pipe.

50% water saving

Innovatech

Amphia Ziekenhuis.

The TECE cistern is fully assembled and sealed to prevent construction debris from getting inside, a practical benefit for prefabrication. Its 10-litre capacity allows the remaining 4 litres of flush water to be used immediately for a second flush. Depending on the flush plate, either single or dual-flush technology can be used. Amphia uses TECEambia flush plates, which are suitable for water-saving dual-flush operation. The small button always delivers a 3-litre flush. The large button delivers the larger flush volume, which can be set to 4.5/6/7.5 or 9 litres as required. The smaller the flush volume, the greater the water saving. Choosing a 4.5-litre flush saves 50% of water. In recognition of its contribution to sustainability, TECE won the DESIGN PLUS award at the time.

All flush plates fit

Innovatech

Quickly select a WC flush plate with the online configurator.

Whichever TECE flush plate range you choose, it will fit any concealed cistern frame. So there is no hassle during installation. Most flush plates can also be installed flush with the wall using a handy installation frame. The online configurator lets you see at a glance which flush plate is the best fit. 

Question about this story? Ask your question

Wie aan Amphia Ziekenhuis werkte

  1. prefab wandmoduleTriple PIn this story
  2. installationUnica RotterdamIn this story
  3. spoeltechniekTECEMentioned in Prefabricated module with TECE flushing technology at Amphia Hospital
  4. consortiumFourCareMentioned in ‘Doing what you do best, together’
  5. technical service providerENGIE ServicesMentioned in ‘Doing what you do best, together’
  6. technical service providerUnicaMentioned in ‘Doing what you do best, together’
  7. bouwkundige partijVan WijnenMentioned in ‘Doing what you do best, together’
  8. bouwkundige partijTrebbeMentioned in ‘Doing what you do best, together’
  9. spoeltechniekTECE NederlandMentioned in Proven prefabricated wall system with integrated flushing technology
  10. technische materialenGroothandel Technische UnieMentioned in ‘We took care of everything for the installers, from A to Z’
  11. building services consortiumi4CareMentioned in ‘We took care of everything for the installers, from A to Z’

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAmphia Ziekenhuis
  • ThemeFuture-proof water and sanitary systems
  • SubjectSanitaryware
  • CompanyTriple P
  • CompanyUnica Rotterdam
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.