Wholesale supplier Technische Unie supplied the technical materials for the new Amphia Ziekenhuis on behalf of installation consortium i4Care (ENGIE Services and Unica). These ranged from cable management systems to switching and fixing materials, lighting and ventilation systems.

“We were selected in part because of our smart and efficient approach to the project,” says Frans Reijerse, Sales Office Manager at Technische Unie. “This is reflected not only in our carefully selected products, but also in our excellent project support. Depending on the construction phase, between 1 and 5 Technische Unie logistics staff were on site to provide all the installation engineers with the right materials, just in time and just in place. Materials were delivered in daily quantities in convenient storage cabinets or on mobile dollies, enabling the engineers to work as efficiently as possible. The installation consortium also had dedicated points of contact, both on site and at our sales office in Breda, which also served as a materials hub.”

tu msu kast met monteur kopieren

Depending on the construction phase, between 1 and 5 Technische Unie logistics staff were on site to provide all the installation engineers with the right materials, just in time and just in place.

Technische Unie pre-assembled the lighting systems and switching equipment and delivered them to the project ready for plug-in connection, says Reijerse. “This not only saved valuable installation time, but also reduced connection costs and the costs of errors during construction to a minimum. All that was needed was to connect the correct plug-in connectors. In this way, we took care of everything for installation consortium i4Care, to its complete satisfaction. There’s a reason we’re known as ‘the Enablers’.”

For more information about the partnership and Technische Unie’s smart approach to projects, visit https://youtu.be/AZyPBQTJZ20.     

Question about this story? Ask your question

Wie aan Amphia Ziekenhuis werkte

  1. prefab wandmoduleTriple PMentioned in Amphia Ziekenhuis, Breda | Amphia ziekenhuis with flushing technology in a prefabricated wall module
  2. installationUnica RotterdamMentioned in Amphia Ziekenhuis, Breda | Amphia ziekenhuis with flushing technology in a prefabricated wall module
  3. spoeltechniekTECEMentioned in Prefabricated module with TECE flushing technology at Amphia Hospital
  4. consortiumFourCareMentioned in ‘Doing what you do best, together’
  5. technical service providerENGIE ServicesMentioned in ‘Doing what you do best, together’
  6. technical service providerUnicaMentioned in ‘Doing what you do best, together’
  7. bouwkundige partijVan WijnenMentioned in ‘Doing what you do best, together’
  8. bouwkundige partijTrebbeMentioned in ‘Doing what you do best, together’
  9. spoeltechniekTECE NederlandMentioned in Proven prefabricated wall system with integrated flushing technology
  10. technische materialenGroothandel Technische UnieIn this story
  11. building services consortiumi4CareIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAmphia Ziekenhuis
  • SubjectProjects
  • CompanyGroothandel Technische Unie
  • Companyi4Care
Share this article

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.