Projects

‘Doing what you do best, together’

‘Doing what you do best, together’

Designing and building a hospital complex fit for the future is possible if there is integrated collaboration on crucial aspects, say the construction partners behind the new building for Amphia in Breda (80,000 m²), which opened in November. To achieve this, the hospital’s brief was set out in an integrated contract, delivered by the FourCare consortium. The technical services providers were equal partners, with no distinction between disciplines, say Gerard van Boxtel (project director) and Ralph Postma (lead engineer).

Working together with the construction companies and the client, from a single site office, led to an integrated delivery approach based on a contract without a traditional specification. Van Boxtel, representing ENGIE Services within FourCare, says: “‘Without a traditional specification’ means that during the tender phase, Amphia submitted a design at the detailed design stage, which was subsequently optimised on several fronts, both in terms of budget and content.”

The technical services providers within FourCare, ENGIE and Unica, helped design the hospital in an equal partnership with the construction companies Van Wijnen and Trebbe. “A major advantage of a consortium, chosen for the construction phase to spread the risks, is that we have the technical know-how to contribute to the design. The principle was to do what you do best.”

dsc 0048 kopieren

Much of the work was prefabricated, including plug-and-play electrical installations.

The energy concept for the new Amphia is based on low-temperature heating and high-temperature cooling. A total of six ATES wells were drilled for this purpose. Two of the building sections each house two heat pumps, supported by a heat recovery system on the air handling units. “This reduces CO2 emissions by 80%. Gas-fired boilers serve as back-up. Climate ceilings and LED lighting have also been installed throughout.” The result is an EPC below 1.

DRUPS

As part of the optimisation of the new-build design, two of the four technical rooms in the building sections were eliminated and centralised. The main technical plant, including the ICT facilities (MER and SER), is located on the top floor of the intervention building and one of the nursing buildings. “The number of ATES systems was also reduced from four to two, with four dry coolers instead of eight and four heat pumps instead of twelve, while maintaining the redundancy originally specified for all systems,” says Ralph Postma, representing Unica within FourCare. “All the optimisations mentioned were checked against the EPC<1 requirement,” Van Boxtel adds. “The systems produce sustainable cooling, which can be used to cool the new building in summer.” In practice, it has emerged that the heat pumps in the new building have excess capacity that could potentially be used in the planned renovation of the old building on Molengracht. “The new building is very well insulated, including with triple glazing. Quality has not been compromised either. Critical systems such as ventilation and heat and cooling generation have been designed with redundancy.”

dsc 0045 kopieren

The main technical plant is centralised on the top floor of the intervention building and one of the nursing buildings.

According to FourCare, the optimisation process resulted in improvements to the design. “One example is the introduction of DRUPS, which provides an uninterruptible power supply in the event of a failure,” says Postma. “A flywheel that runs continuously keeps the generator turning for long enough to bring the engine up to speed immediately in the event of a power failure. The hospital can continue to operate in full, with a maximum capacity of 2MKVA. We also introduced a separate chiller for the operating theatres, partly to ensure dehumidification.”
Prefabrication

The conversation repeatedly turns to the points where building services and structural elements intersect, a topic that clearly excites those involved. Van Boxtel says: “A lot was prefabricated, including plug-and-play electrical installations, sections of the drainage system, HVAC pipework and secondary controls, but it was above all the logistical coordination with the structural work that delivered benefits.” Postma adds: “For example, the partition walls between the nursing rooms and their respective bathrooms were prefabricated, including the sanitary fittings. The building’s pipework is sometimes bulky, but the joint decision to install a large part of the building services in front of the walls meant that larger elements could be brought inside. As this work took place during the shell construction phase, before the finishing phase, it saved a considerable amount of time.”

This kind of integrated collaboration naturally needs careful preparation. “Changes were possible, but the construction drawings had to be ready ten weeks before the work was carried out, and from that point everything was fixed,” says Van Boxtel. “Within FourCare, we used detailed 250-point schedules that were followed rigorously, with just-in-time deliveries to each floor, and we are proud of the end result. For the consortium, the process from design through to delivery was very much at the forefront. It is no coincidence that these four companies are also working together on other projects.”

Question about this story? Ask your question

Wie aan Amphia Ziekenhuis werkte

  1. prefab wandmoduleTriple PMentioned in Amphia Ziekenhuis, Breda | Amphia ziekenhuis with flushing technology in a prefabricated wall module
  2. installationUnica RotterdamMentioned in Amphia Ziekenhuis, Breda | Amphia ziekenhuis with flushing technology in a prefabricated wall module
  3. spoeltechniekTECEMentioned in Prefabricated module with TECE flushing technology at Amphia Hospital
  4. consortiumFourCareIn this story
  5. technical service providerENGIE ServicesIn this story
  6. technical service providerUnicaIn this story
  7. bouwkundige partijVan WijnenIn this story
  8. bouwkundige partijTrebbeIn this story
  9. spoeltechniekTECE NederlandMentioned in Proven prefabricated wall system with integrated flushing technology
  10. technische materialenGroothandel Technische UnieMentioned in ‘We took care of everything for the installers, from A to Z’
  11. building services consortiumi4CareMentioned in ‘We took care of everything for the installers, from A to Z’

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAmphia Ziekenhuis
  • ThemeIntegrated construction and building services
  • SubjectProjects
  • CompanyFourCare
  • CompanyENGIE Services
  • CompanyUnica
  • CompanyVan Wijnen
  • CompanyTrebbe
Share this article

Advertisement

Follow Installatie & Bouw Nederland

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.