The former Rabobank building in Bladel, in the province of North Brabant, has been transformed into a brand-new, vibrant community centre. A major renovation was needed to achieve this, but the result speaks for itself. Ronald Driessen, project manager at Hanab Installation Technology, tells us more.
Community centre Den Herd was housed in an ageing building. The former Rabobank on the Markt was chosen as the new location: a closed-off, rather complex building. To create a new community centre, part of the building was demolished and extensive renovation work followed. The building was literally opened up, with a multifunctional atrium at its centre connecting three floors. The panorama room is on the second floor, with the library and a study room on either side. A total of 49 associations use the new BRUIS, including Visit Bladel, the senior citizens’ association, Bladels Creatief and the billiards club. One of the most important spaces is, of course, the theatre, which hosts a variety of performances.

Revising the plans
Hanab installed the electrical and mechanical systems throughout the building. The original plan was to install a thermal energy storage system beneath the building, but the ground layers in the municipality of Bladel proved unsuitable for this after all. The plans therefore had to be revised. “The requirements for sustainability and comfort remained unchanged. We therefore opted for two air-to-water heat pumps, which were installed on the roof. The rooms are cooled and heated using underfloor heating and, in part, induction units in the ceilings. We reused 80 units from the old building. Air and water are connected to them, so they can be used for both cooling and heating,” says Driessen.
A Priva control system is used to manage the indoor climate. The building is divided into different zones, with the control technology managing the requirements of each one.

Silent alarm evacuation
BRUIS is state of the art when it comes to sustainability. The LED lighting is fully DALI-controlled, and distribution boards have been installed on several floors. A busbar trunking system runs from the main distribution board to supply them. Hanab also installed the complete data network and fire alarm and evacuation system. Driessen says: “In the past, buildings had a fire pager system that used beepers. Here, we installed Connect Evac from Hertek. It is a smartphone application for silent alarm evacuation. It is a clear system that works well. This was the first time we had used it.”

A challenging schedule
The new community centre opened on 1 April. Driessen is very pleased with the result, despite some challenges along the way: “The steel structure of the existing building is connected to the theatre, which is new. As a result, the building remained open for a long time. We started work as soon as it was enclosed, because our systems must not get wet. The schedule was sometimes challenging. There are also many factors you cannot control, but the result is fantastic. It was a good, enjoyable project for us, with excellent cooperation between everyone involved in the work. Both the interior and exterior look very good.”
Question about this story? Ask your question
Wie aan BRUIS werkte
- Electrical and mechanical installationsHanab Installation TechnologyIn this story
- control technologyRisto RegeltechniekMentioned in A comfortable indoor climate for BRUIS, thanks to control technology
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBRUIS
- SubjectBuilding services engineering
- CompanyHanab Installation Technology