Amare a major project for metal construction company
Text Desiree PenningsImage Donk Constructie

Amare in The Hague was a special and substantial project for Donk Constructie. The company became involved through the main contractor, then fitted all the service shafts with open-grid flooring. It also installed around 200 portal frames in the plasterboard walls for the door frames, made handrails and balustrades, and used frames and supports to enable the air handling units, complete with pipework, to be installed on the roof.
“We were involved from start to finish,” says Geert-Jan van Zagten, owner of Donk Constructie. “Because the project was divided into several contracts, it remained manageable throughout.”
The work took place between 2019 and 2021, but the company is still working at Amare, as a follow-on contract has since been added. The insulation on the air handling unit pipes is being replaced. Once this is complete, Donk Constructie will build various access platforms so that installers can reach the equipment more easily for maintenance in future, without touching the insulated pipes.

Special shaft floor
The four triangular service shaft floors in the main concert hall were what made the project particularly unusual. The hall stands on a series of spring mounts, separate from the rest of the building, to prevent noise and vibration. Van Zagten explains: “This meant we had only one side to attach everything to. Together with our regular structural engineer, we came up with a suspended structure, then installed the shaft floors using special rubber. Designing this was the biggest challenge, given the heights and angles involved.”
Air handling unit frames
Making frames for air handling units is more familiar work for Donk Constructie. The company does this regularly, for example for businesses and hospitals. Service shafts are familiar territory too, says Van Zagten. “For example, we are currently working for Dura Vermeer on a new-build office next to the Amsterdam Arena. The complexity here lies mainly in producing the drawings. That is what makes it interesting for us. We have plenty of experience and are happy to contribute to the contractor’s and installer’s design, either directly or through BIM.”
Een zakelijke vraag aan Donk Constructie? Get in touch
Who worked on Amare
- construction consortiumCadanzMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- construction consortiumBoele & van EesterenMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- construction consortiumVisser & Smit BouwMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- electrical, mechanical and sanitary installationsHOMIJ Technische InstallatiesMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- WKO-systeemDubotechniekMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- bevochtigingsinstallatiesCumulus NederlandMentioned in Advanced humidification and water treatment for Amare, The Hague: Pure water, pure voices
- Electrical and mechanical installationsHanab Installation TechnologyMentioned in Construction and maintenance at Amare
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAmare
- SubjectGeneral
- CompanyDonk Constructie