Amare, The Hague: Landmark building with high sustainability ambitions

The Netherlands’ largest education and cultural complex was completed in the centre of The Hague at the end of June. Amare, with a footprint of approximately 70x125x40 metres (lxwxh), will be the new home of Dans- en Muziekcentrum Den Haag, Nederlands Danstheater, Residentie Orkest and Koninklijk Conservatorium. A strong commitment to sustainability underpinned the design and construction of this landmark building. Features including 4,000 m² of solar panels, an extensive greywater system and a thermal energy storage system have contributed to its BREEAM-NL ‘Excellent’ certification.
Amare was commissioned by the Municipality of The Hague and delivered under a Design, Build & Maintain contract by the Cadanz construction consortium (Boele & van Eesteren and Visser & Smit Bouw). HOMIJ Technische Installaties was responsible for the electrical, mechanical and plumbing installations. “From the design stage onwards, particular attention was paid to energy and water consumption, user wellbeing and the surrounding environment,” says project manager Tjerk Jan Zwerver. “To prevent water wastage, we installed an extensive greywater system. A large proportion of the rainwater collected is used to flush the toilets. The remaining rainwater is efficiently discharged to infiltration crates outside the building. From these crates, the water seeps gradually into the ground, easing the burden on the municipal sewer system.”

Sustainable energy systems
Solar panels provide sustainable energy generation, he says. Energy-efficient LED lighting has also been installed throughout the building, with occupancy detection and daylight controls, and low power consumption per square metre. “For heating and cooling the new building, we worked with Dubotechniek to install a thermal energy storage system with two warm and two cold sources, together with three heat pumps. The Hague’s district heating network meets additional heat demand at peak times and provides domestic hot water.” The heat emission systems vary according to the function of each space. “The basic approach is to provide climate control via the air handling units, supplemented by induction/fan coil units. Energy-saving CO2 controls have also been installed in many areas,” says Zwerver. “Underfloor heating and/or cooling was also selected for a number of spaces. This includes the dance studios and stage, where a carefully controlled indoor climate goes hand in hand with excellent comfort for the dancers. To gain a clear understanding of energy flows, sub-metering has been provided for each building section and/or zone.”

Optimum acoustics, without structure-borne noise
According to Zwerver, acoustics presented a major challenge in this project. “The building has four large halls, as well as various studios and classrooms. All these spaces need to be usable independently, without sound travelling from one to another. Measures have been incorporated not only into the building fabric but also into the building services. We paid particular attention to the suspension and support of the air ducts and water pipes. Flexible connections have also been used in various locations to prevent structure-borne noise.” A second challenge, he says, was ventilation in the largest concert hall. “There was limited space for air supply outlets in this room, while maintaining optimum air quality without draught complaints was essential. To ensure effective air circulation, we designed specialist grilles with nozzles and swirl diffusers, concealed in the balcony fronts. These bespoke grilles are cleverly combined with standard grilles near the seats, for example. All building services were designed and installed in close consultation with the users and the construction consortium.”
Question about this story? Ask your question
Who worked on Amare
- construction consortiumCadanzIn this story
- construction consortiumBoele & van EesterenIn this story
- construction consortiumVisser & Smit BouwIn this story
- electrical, mechanical and sanitary installationsHOMIJ Technische InstallatiesIn this story
- WKO-systeemDubotechniekIn this story
- bevochtigingsinstallatiesCumulus NederlandMentioned in Advanced humidification and water treatment for Amare, The Hague: Pure water, pure voices
- metaalconstructiebedrijf
Donk ConstructieMentioned in Amare a major project for metal construction company - Electrical and mechanical installationsHanab Installation TechnologyMentioned in Construction and maintenance at Amare
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAmare
- SubjectProjects
- CompanyCadanz
- CompanyBoele & van Eesteren
- CompanyVisser & Smit Bouw
- CompanyHOMIJ Technische Installaties
- CompanyDubotechniek