Construction and maintenance at Amare
Text Desiree PenningsImage Hanab

Whether they come for a concert, to take part in music or dance classes themselves, or simply for a cup of coffee, Amare is an open, public building where people can meet in an accessible setting. Hanab Installation Technology was responsible for the design and installation of all building services. Hanab Property Management then took over maintenance, no small undertaking.
Amare is home to the Stichting Dans- en Muziekcentrum Den Haag, Nederlands Danstheater, Residentie Orkest and Koninklijk Conservatorium. The Education and Cultural Complex has four auditoriums: the theatre hall (1,500 people), concert hall (2,500 people), ensemble hall (600 people) and rehearsal hall (200 people), as well as a Stadskantine and around 1,100 spaces for education, studios, catering, meetings, rehearsals, offices and shops. Each space has its own form and function. The high-quality finishes meet stringent acoustic requirements.

BREEAM-certified
Hanab Installation Technology ensured that the air ducts and water pipes were suspended and supported with precision. Flexible connections were also used to prevent structure-borne noise. In addition, all building services were designed and installed to meet the requirements of the users and clients. Although BREEAM certification is uncommon for a building with a theatre function, Amare was certified. As a result, the design placed considerable emphasis on sustainability, energy use and wellbeing. The roof has 4,000 square metres of PV panels, rainwater is used to flush the toilets, and the building has a thermal energy storage system with two warm and two cold wells, combined with three heat pumps. This system was installed by Dubotechniek.

Looking to the future
After the building opened, Hanab Property Management began work under a 25-year maintenance contract. Contract manager Tom Werkhoven: “Maintenance covers everything fixed to the building, including lighting, the audiovisual system, stage lifting equipment, floors, walls and façade lighting. We carry out preventive and replacement maintenance and fix faults. We have already drawn up a maintenance plan for the next forty years, including a forecast of everything that will need replacing.”
Proud of both companies
The performance requirements are demanding. To meet them, Hanab maintenance technicians are always on site. “The systems must always operate in such a way that users are not inconvenienced. That is why we also have a fault response service,” Werkhoven continues. “Thousands of students pass through the building every day. They attend lessons, study, work in the offices and dance. Each user has their own operations, with separate needs and requirements. We take these into account, even though the contractual terms are the same for everyone. As our staff are on site every day, Hanab is effectively the fifth user. Our technicians are part of Hanab, but also part of Amare. They are proud of the building and feel connected to the people who work there. They are proud of their work at Amare and Hanab Property Management.”
Question about this story? Ask your question
Who worked on Amare
- construction consortiumCadanzMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- construction consortiumBoele & van EesterenMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- construction consortiumVisser & Smit BouwMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- electrical, mechanical and sanitary installationsHOMIJ Technische InstallatiesMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- WKO-systeemDubotechniekMentioned in Amare, The Hague: Landmark building with high sustainability ambitions
- bevochtigingsinstallatiesCumulus NederlandMentioned in Advanced humidification and water treatment for Amare, The Hague: Pure water, pure voices
- metaalconstructiebedrijf
Donk ConstructieMentioned in Amare a major project for metal construction company - ClientGemeente Den HaagIn this story
- Main contractorBouwcombinatie CadanzIn this story
- ArchitectsNOAHHIn this story
- ArchitectsJCAUIn this story
- ArchitectsBrunn OntwerpIn this story
- ArchitectsStudio Aziz BekkaouiIn this story
- Electrical and mechanical installationsHanab Installation TechnologyIn this story
- maintenanceHanab Property ManagementIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectAmare
- SubjectGeneral
- CompanyGemeente Den Haag
- CompanyBouwcombinatie Cadanz
- CompanyNOAHH
- CompanyJCAU
- CompanyBrunn Ontwerp