The new-build facility for Bronkhorst High-Tech on Nijverheidsstraat in Ruurlo was completed just before the summer construction break. The project includes a multifunctional staff canteen of around 1,000 m², which will also be used as a conference venue. Wassink Installatie was responsible for the design and installation of all electrical, mechanical and sanitary systems in the project. These range from the heating, cooling and ventilation systems to the lighting and power installations, PV system, DALI-dimmable LED lighting and associated control systems, which are integrated into Bronkhorst High-Tech’s central building management system.
‘BIM ensures building elements and building services are perfectly coordinated’

The BIM design gave Bronkhorst High-Tech an immediate, clear insight into the new-build facility.
As a market leader, Bronkhorst High-Tech develops and manufactures thermal mass flow meters and controllers for a wide range of applications, from (petro)chemicals and the oil and gas industry to healthcare and the food and packaging industry. As its long-standing partner for building services, Wassink Installatie has been maintaining and managing the systems in Ruurlo for many years. “We are also involved in renovation and new-build projects from the very first sketch,” says Tim Zweers, Head of Commercial Operations, Utilities & Industry at Wassink Installatie and project manager for the new-build facility. “That way, building elements and building services can be perfectly coordinated. The new-build facility in Ruurlo is a great example of this.”
Challenging project
“Bronkhorst High-Tech has grown significantly in recent years,” says Zweers. “Both in terms of deliveries and staff numbers, creating a need for a larger canteen/conference venue.” The new-build facility broadly consists of two parts: a staff canteen with a professional kitchen, bar/lounge and sanitary facilities, and a conference room with a movable partition that can accommodate up to 600 people. “Ensuring the space could be heated, cooled and ventilated optimally for varying occupancy levels was a major challenge. Bronkhorst High-Tech also wanted a sustainable, gas-free new-build facility, with as few visible installations as possible. And because the facility also includes a conference room, all systems had to operate in near silence.”

Ensuring the new-build facility could be heated, cooled and ventilated optimally for varying occupancy levels was a major challenge.
Given the high cooling demand of the new-build facility, Wassink Installatie looked for the most economical and sustainable cooling-generation method during the preparatory phase. “In close consultation with a specialist in ground energy, we opted for an open-loop ground-source system,” says Zweers. “This means chilled water can be pumped to the building using relatively little energy. Climate ceilings were selected as the heat-emission system, providing optimum cooling and heating. A large air handling unit in the plant room supplies the required supplementary cooling as well as ventilation air. Temperature and CO2 sensors monitor indoor climate conditions in the new-build facility 24/7, with variable volume dampers controlled by zone in response.”

Bronkhorst High-Tech wanted a sustainable, gas-free new-build facility, with as few visible installations as possible.
3D/BIM
The complete design for the new-build facility was developed in 3D/BIM, with Wassink Installatie, iDX architecten, contractor Van Wijnen Eibergen and structural engineer Schreuders working together in a single model. “Our BIM modellers worked out all the building services in detail, using the architect’s comprehensive design as a basis,” says Zweers. “The BIM design gave Bronkhorst High-Tech an immediate, clear insight into the new-build facility. Exchanging and clash-detecting (IFC) models with the contractor and structural engineer also kept clashes and rework costs to a minimum during construction.”

We are involved in renovation and new-build projects from the very first sketch. That way, building elements and building services can be perfectly coordinated. The new-build facility in Ruurlo is a great example of this.
Fast, accurate and consistent
For its BIM projects, Wassink Installatie often uses Stabicad for Revit software from Stabiplan. “Alongside the BIM content provided by our suppliers, we use information from the BIM library,” says Alex Stein, BIM modeller at Wassink Installatie. “MEPcontent makes it very easy to add installations and components to our model, so building services and components are shown with a high level of detail. Compared with standard Revit, we can work up to three times faster with Stabicad for Revit. The content is also much more accurate, improving the quality of our BIM models. We used Stabicad’s element code monitor to draw, connect and import the installations in the plant room.”
To make its BIM designs even more consistent, speed up the design process and ensure clear communication, Wassink Installatie recently developed its own BIM template in collaboration with Stabiplan. “The template specifies not only the colours for supply, return and water pipes, among other things, but also the required installation information and fonts. This enables us to save even more design time, while taking the quality and clarity of our designs to an even higher level.”
Question about this story? Ask your question
Who worked on it
Bronkhorst High-Tech canteen Ruurlo in Berkelland, nieuwbouw
- engineering and constructionWassink Installatie
- contractorVan Wijnen Eibergen
- structural engineerSchreuders
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBronkhorst High-Tech canteen Ruurlo
- SubjectProjects
- CompanyWassink Installatie
- CompanyVan Wijnen Eibergen
- CompanySchreuders